About Us

 Executed Projects

·          Participation in designing a demo of robotic glazing cell for Automotive Industries, Advanced Manufacturing Research Center, (Jan.-July 2000).

 

·          Supervising installation of robotic applications in an automotive production line (car: Peugeot 405) for I.K.Co., (Aug. 2000-Dec.2001).
·          Parameter setting & modification for robotic resistance welding guns, (in Peugeot 405 line / Jan.-March 2002).
·          PM (Preventive maintenance) & wear part supplying of robotic resistance welding guns, (in Peugeot 405 line / March-Sept. 2002).
·          Designing robotic grippers for Side-frame production line of Peugeot 206, (Sept. 2002-Jan.2003).
·          Graphical simulation for robotic handling of Side-frame panels of Peugeot 206, (Feb.- June 2003).
·          Designing robotic grippers for cradle production line of Peugeot 405 for I.P.Co., (July-Aug.2003).
·          Designing robotic grippers for doors production line of Peugeot 405 for I.K.Co., (Sept.2003-Jan 2004).
·          Supervising assembly of designed robotic grippers (Above mentioned projects), TAM Co., (Feb.-May 2004).